Shanghai Old Port Project
Size: 4x750T/D

Slag conveying system
Fly ash conveying system
Fly ash curing system

other (2)

Shanghai Solid waste disposal center
Size: 2x250T/D
Furnace bottom conveying system
Flue gas ash conveying system

other (3)

Lasa incineration power plant
Size: 2x350T/D

Furnace bottom conveying system
Boiler ash conveying system
Screw ash cooling equipment

other (4)

Capital Group(Duyun Project)
Size: 2x400T/D

Fly ash curing euipment

other (5)

Yulin municipal solid waste Incineration power plant
Size: 2x400T/D

Boiler ash conveying system

other (6)

Sinoma(Tianshui Project)
Size: 1x600T/D

Flue gas ash conveying system

other (7)

Lanxi Wangneng Environmental
Size: 1x400T/D

Flue gas ash conveying system

other (8)

Zibo Lvneng New Energy
Size:2x500T/D

Flue gas ash conveying system

other (9)

Guang'an Incineration power plant
Size: 2x400T/D

Furnace bottom conveying system
Boiler ash conveying system
Flue gas ash conveying system
Flue gas purification system

other (10)

Bazhong Incineration power plant
Size: 2x300T/D

Boiler ash conveying system
Flue gas ash conveying system

other (11)

Yulin Solid waste Incineration plant
Size: 2x400T/D

Boiler fly ash conveying system

other (12)

Linzhou Jiasheng New Energy
Size: 1000T/D

Slag conveying system